FMEA Special: Control Plan According to IATF 16949 and Corresponding AIAG/VDA Requirements Process FMEA and handling “special characteristics”
Process FMEA (P FMEA) identifies risks in processes. The Control Plan (CP) includes measures to control these risks in the manufacturing processes. Both documents are closely interconnected, with some references to the same data, and must be maintained and managed in sync to ensure a zero defect serial production launch.
ImportantThis event does not currently have an available date. Please contact us if you are interested.
Content

  • Structure of the Process FMEA according to the AIAG/VDA method description
  • The requirements of IATF 16949 for the Production Control Plan (CP)
  • The requirement for VDA Volume 06 Part 03 for the Production Control Plan (CP)
  • Structure and requirements for the Control Plan
  • Intersections and interactions of P FMEA and CP
  • Control and management of Special Characteristics in the CP
  • Scope of services

  • 1 day
  • Professional training management
  • Training documents (PDF download)
  • Certificate of participation
  • Lunch as well as snacks and beverages during the coffee/tea breaks
  • Adequate freedom for sharing experiences and knowledge transfer
  • A pleasant training atmosphere with the best service
  • Benefit

    The training highlights the intersections of the P FMEA with the CP and provides solutions for developing data models with the goal of synchronizing the two documents.

    Group of participants

  • FMEA moderators
  • Specialists in planned FMEA
  • Quality manager
  • Planning engineers, production planners
  • Inspection planner, Quality manager
  • Auditors
  • Requirements

    Methodological knowledge FMEA

    Participant fee
    The participation fee is 580,00€ (net)