Process FMEA (P FMEA) identifies risks in processes. The Control Plan (CP) includes measures to control these risks in the manufacturing processes. Both documents are closely interconnected, with some references to the same data, and must be maintained and managed in sync to ensure a zero defect serial production launch.
ImportantThis event does not currently have an available date. Please contact us if you are interested.
The training highlights the intersections of the P FMEA with the CP and provides solutions for developing data models with the goal of synchronizing the two documents.
Methodological knowledge FMEA
The participation fee is 580,00€ (net)